751 - 9/19/04 - 14:46
|
752 - 9/19/04 - 14:51
Stacy and Jake are controlling the end of the guy wire that is
being hoisted.
|
753 - 9/19/04 - 14:52
The guy wire is lifted up high,
so that it can be coiled on the ground.
There is a "spinner" attached to the hoist so that the guy
wire can be coiled as the guy wire is lowered to the ground.
|
754 - 9/19/04 - 14:57
|
755 - 9/19/04 - 15:00
|
756 - 9/19/04 - 15:02
|
757 - 9/19/04 - 15:13
The hoist is now being lifted back in place so that the B leg
guy wire can be removed from the tower and attached to the hoist.
|
758 - 9/19/04 - 15:13
|
759 - 9/19/04 - 15:17
|
760 - 9/19/04 - 15:19
|
761 - 9/19/04 - 15:25
|
762 - 9/19/04 - 15:31
|
763 - 9/19/04 - 15:38
|
764 - 9/19/04 - 15:42
|
765 - 9/19/04 - 15:42
|
766 - 9/19/04 - 15:42
Jake and Stacy are again controlling the end of the guy wire
as it is being hoisted.
|
767 - 9/19/04 - 15:42
|
768 - 9/19/04 - 15:44
|
769 - 9/19/04 - 15:46
|
770 - 9/19/04 - 15:47
|
771 - 9/19/04 - 15:54
|
772 - 9/19/04 - 15:55
|
773 - 9/19/04 - 15:56
|
774 - 9/19/04 - 15:57
|
775 - 9/19/04 - 16:00
|
776 - 9/19/04 - 17:10
|
777 - 9/19/04 - 17:13
|
778 - 9/19/04 - 17:13
|
779 - 9/19/04 - 17:14
The crew are now coming down for a lunch break.
|
780 - 9/19/04 - 17:31
|
781 - 9/19/04 - 21:11
|
782 - 9/19/04 - 21:12
|
783 - 9/19/04 - 21:13
|
784 - 9/19/04 - 21:13
|
785 - 9/19/04 - 21:16
|
786 - 9/19/04 - 21:22
|
787 - 9/19/04 - 21:24
|
788 - 9/19/04 - 21:25
|
789 - 9/19/04 - 21:25
|
790 - 9/19/04 - 21:27
|
791 - 9/19/04 - 21:35
|
792 - 9/19/04 - 21:36
|
793 - 9/19/04 - 21:37
|
794 - 9/19/04 - 21:40
Enlarged view.
Not the best photo in the world,
but I managed to see the plane flying by.
|
795 - 9/19/04 - 21:42
|
796 - 9/19/04 - 21:55
Another section being moved to storage.
|
797 - 9/19/04 - 21:56
|
798 - 9/19/04 - 22:00
|
Notes:
- There are up to six riggers working up in the tower.
- The very bottom section is 16' and is one foot AGL.
- The next six sections at the bottom are about 26.667'.
- Each remaining section is 20'.
- The T-bar is 11'.
- Currently scheduled date for antenna sticks to be installed: 8/1/04.
- The antennas will be hoisted into place.
- One of the copper signal feeders will carry channel 15.
The other copper feeder will carry a combined 19 and 32 (DTV).
The waveguide will carry channel 57.
- Original images are 2560x1920 - TIFF (5 Mpixel)
- Starting with the 6/15/04 images, they are 3264x2448 - TIFF
(8 Mpixel)
- Enlarged views are 720x540 cuts
- Blowup views are 360x270 cuts enlarged to 720x540
- The EXIF value for the time the shots were taken is CST, not CDT
- Starting with the 6/15/04 images, the EXIF value for the time
the shots were taken is GMT
|